HUXMechanical project
WorkshopDocumentsEngineering verification — 2026-09-28V0-GENESIS · archive

PARKED STAIR-V1 — 2026-09-28. This is historical research, not an active requirement, BOM or build gate. V1-PROOF governs current work.

Engineering verification — 2026-09-28#

Revision: 2026-09-28-B. Input SHA-256: 3aef03b21d75b8c224e416facf1859d6a5627259db956ccc661751a9979dd252.

  • python3 tools/engineering/review.py --write completed with the stored results. The preferred candidate uses 241.3 mm links, H1-B and a 120 mm stepping track. All release flags remain false.
  • python3 tools/engineering/test_review.py: 13 checks passed. Coverage includes mass/inertia translation, battery/COM sensitivity, enclosure fit, exact split-offset FK/IK, unreachable targets, gravity virtual work, lateral mirroring, contact sequencing, CAN/height budgets, moving width, continuous segment/box distance and the rejected aft motor package.
  • npm test in tools/living-drawings: passed, including the engineering checks, 200 legacy spatial FK/IK cases, 402 projection frames, assumption/frontal checks and the Rapier regression suite. Its old stair candidate remains deliberately rejected; the short-hop regression does not prove controlled support.
  • Python compilation and JavaScript syntax checks passed. git diff --check passed.
  • Stored head properties agree with the current input. Regenerating SVG, HTML and BOM from the stored results produces identical hashes. Revised Markdown local-link targets exist.
  • H1 SVG and the engineering page were visually inspected. This checks presentation, not manufacturing fit.

Preferred candidate: 91 connected poses plus 810 interpolated samples; no reach, limited-envelope or width-gate flags. The heavier-head case also passes those screens. Peak nominal gravity roll/pitch/knee torque: 6.61 / 3.92 / 7.89 N·m. Maximum modeled nominal span: 355.44 mm, leaving only 0.16 mm to the nominal width bound.

Not verified: real ankle carrier, exact component SKUs, complete inter-part swept solids, service/harness access, structural allowables, smooth timed dynamics, real contact footprint/traction, installed thermal duty, current/regen, firmware, single-leg support or a physical step. No purchases or fabrication release were made. Steve subsequently authorized committing and pushing the review to main.