Active from 2026-09-28. Updated 2026-10-16: powered hips leave V1-PROOF. PF04, PF05, PF07 and PF15 change. The one-leg and stair requirements are dropped. Decision.

The user's scope reset supersedes the stair project. The archive keeps the historical R1–R44 requirements. They do not constrain this proof build. Plan and finish line.

IDRequirementAcceptance / scope
PF01Strictly under $1,000 new cashEntire proof build, all stages, tax, shipping, consumables and repairs; $900 planned ceiling
PF02Reuse suitable equipment firstConfirm exact items before deducting budget; no assumed free inventory
PF03Small, lightweight robot2.5 kg proposed target; 3.0 kg maximum including battery
PF04Two powered axesTwo wheels. Legs locked at 30°. Powered hips return in the next version. No roll or ankle axes
PF05Balance with pinned legsAll V1-PROOF trials use the 30° lock. The structure, wheels and electronics carry into the next version
PF06Two-wheel balance and manual drive60 s balance 9/10 starts; forward/reverse, left/right arcs and both in-place rotations; physical protocol
PF07Moved to the next versionPowered leg-height change. Not a V1-PROOF gate
PF08Shallow indoor irregularitiesAt 0.15 m/s: ±3° cross-slope, 3° ascent/descent, 5 mm smooth bump over 300 mm, 3 mm seam; no rough terrain or stairs
PF09Slow travel0.25 m/s cruise; 0.5 m/s remains unqualified; recovery clearance to 0.65 m/s
PF10Flexible, inexpensive drivesGeared brushed wheel motors and small servos allowed; encoder feedback and mounted duty tests required
PF11Minimal electronicsReceived Pico 2 + SparkFun LSM6DSO baseline; electrical/timing qualification required; zero onboard cameras
PF12Compatible power and fault handlingPack/rails verified at full charge and low operating voltage; current limits, physical cut and stale-data handling
PF13Serviceable shop constructionExisting/COTS stock, removable pack, accessible fasteners, proper bearings and cable strain relief
PF14Honest model and evidencePreliminary drawings before detail CAD; measured mass/CoM and trial logs before performance claims
PF15Ten-minute mixed demonstrationBalance and drive within mounted thermal/electrical limits and no resets; fault recovery requires deliberate rearm

| PF16 | Bounded push recovery | Fore/aft 0.8 N·s, lateral 0.4 N·s at 0.20 m height; 50/200 ms pulses, settle within 3 s; larger human shoves unqualified | | PF17 | Explicit hardware baseline | Selected components and bench gates; no purchase or physical validation implied | | PF18 | Foundation for later versions | Versioned telemetry/commands, measured motor/IMU/contact models, retained failures and regression matrix before payload/perception expansion |

PF01/PF02 and the reduced scope come directly from the user's request. The later 2026-09-28 request adds reliable maneuvers, bounded disturbances, component decisions and a path to higher requirements. The numerical test envelopes and the selected components are design decisions that put that request into effect. They are not measured capabilities. Change them deliberately with the decision log and model.json. Keep the user's budget and scope.