WorkshopMechanicalHUX / Mechanical testing — Layout and timelineV1-PROOF · R05 current build

V1-PROOF / From parts to evidence

Mechanical testing.

Measure the parts. Move the linkage. Keep a record of what happens.

Record a session
R01 test layout · superseded. This page shows the R01 passive leg of 2 October. R05 is the current build. Use the R05 assembly guide and record R05 results in the R05 fit record.
Motor + drivers received · parts printedReported 02 Oct 2026 · 0 shared test results

01 / The first fixture

One passive leg, in detail.

Neutral passive leg layout: 110 mm parallel links, 40 mm pivot spacing and lateral spacer stacks.
Axle rearward
55.00 mm
Axle below pivot
95.26 mm
Link centers
110 mm

Hand moved, power disconnected. Confirm that the prints match R01 before you use the spacer stack. Motor mounts, hub/bearing support and load capacity still need qualification. Assembly guide ↗ · Open the layout sheet ↗

02 / The test route

Earn the next step.

Record each trial. Advance only with the evidence for the whole stage.

  1. Inspect → assemble → hand sweep → packaging → repeatability → qualified powered tests. Open the first checklist ↗

03 / Your session notebook

What did you observe?

Saved on this device. Export a copy to keep it or bring it back to this chat for the shared project record.

04 / The dated record

Every test leaves a trail.

Latest first. Shared project records and your device drafts keep their own labels.

  1. Motor/drivers received · parts printed

    The mechanical fit session is ready. No measured test results are reported.

First fit-session checklist ↗Full bench session record ↗How the dated record works ↗Power and fault gates ↗