V1-PROOF build checklists#
2026-10-16: R05 is the current build. Use the R05 assembly guide and record each result in the R05 print and fit record. The R01, R03 and R04 records below are superseded.
The active checklists are for the small, four-actuator indoor proof with bounded disturbance and shallow-surface qualification. Finish line.
- Mobility and disturbance protocol
- Hardware decisions and interfaces
- Electronics bench guide, opened 2026-10-15: Pico 2 toolchain, IMU, encoder and one wheel channel, stages E0–E6. The bench firmware exists. No stage is closed.
- Kill chain, opened 2026-10-15: rail switch, KILL and ARM buttons, heartbeat gate, stages K0–K6. Design only.
- R05 print and fit record, opened 2026-10-15: plates 1–3 are printed and the frame is assembled, per the user. No dimension is measured.
- Anatomy and layout review, 2026-10-14: the findings that led to R05.
- Single-leg bench plan and session record: parked on 2026-10-16, for the next version.
- Recording workflow
- Mechanical stages and trials
- Electronics bring-up
- Software bring-up
- Pico 2 USB bring-up, opened 2026-10-03: the controller is received. The LSM6DSO IMU is also received, untested, per the user. The BOOTSEL, LED and optional serial results are not recorded yet.
Superseded records:
- R04 body fit review, 2026-10-13
- R03 print completion and assembly, 2026-10-07
- Leg motion report, 2026-10-06
- First mechanical fit session, 2026-10-02 and the R01 test layout
Check a box only after physical evidence exists. Previous stair checklists are parked.